Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi program 5S di PT Ilufak Plaskaging
Author
Wibowo, Handri
Additional Author(s)
Effendy, Muliawan
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041261/IND/2008
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 70
Bibliography: p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xii, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00761/08
(T) - 658.562 Wib I
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan jaminan kualitas di tool regrinding section PT. Toyota Motor Manufacturing Indonesia
Pengurangan setup dalam usaha pengoptimalan investasi
Risk-based engineering
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
Analisa jumlah kebutuhan tenaga kerja di PT Mitra Mulia Makmur
Perancangan dan penentuan standar penilaian 5S di departemen produksi di PT Indofood Sukses Makmur Tbk. bogasari flour mills Surabaya
Penurunan tingkat kecacatan di PT. Bondi Syad Mulia
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor perbankan dan asuransi di Surabaya