Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi program 5S di PT Ilufak Plaskaging
Author
Wibowo, Handri
Additional Author(s)
Effendy, Muliawan
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041261/IND/2008
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 70
Bibliography: p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xii, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00761/08
(T) - 658.562 Wib I
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Implementasi sistem pengendalian kualitas di PT Timur Selatan Pare-Kediri
Upaya minimalisasi selisih perhitungan scrap draht produk tipe 1160 antara AX dengan aktual melalui implementasi qualitiy control circle PT E-T-A Indonesia
Upaya penurunan downtime mesin pada departemen extrusion PT Indal Aluminium. Tbk
Perbaikan sistem monitoring dan evaluasi di PD Karunia untuk sertifikasi ISO 9001:2008
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Upaya minimalisasi jumlah kekurangan material pada proses produksi circuit protection dan kontrol tipe 8340 melalui implementasi quality control circle di PT E-T-A Indonesia
Sikap kerja 5S
Perbaikan mutu pada proses dan produksi spun-pile dengan menggunakan metode taguchi