Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Author
Soebastian, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas akhir No.03011252/IND/2007
Subject(s)
PLANNING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
Appendix: p. 59 - 70
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00949/08
(T) - 658.5038 Soe D
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Usaha peningkatan kapasitas produksi dengan metode lean manufacturing dan line balancing di PT. FSCM Manufacturing Indonesia plant 4
Perancangan alat ukur penilaian kinerja biro kepegawaian sebuah universitas dengan pendekatan balanced scorecard dan baldrige scoring
Analisa hybrid genetic algorithm pada permasalahan penjadwalan flowshop
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia
Organizational planning and control systems
Relokasi pabrik filter dengan mempertimbangkan perencanaan produksi filter di PT Nojorono Tobacco International
Perancangan modul sebagai tools dalam penerapan hpwt di PT "X"
Implementasi sistem manajemen mutu ISO 9001:2000 di PT. E-T-A Indonesia