Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Author
Soebastian, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas akhir No.03011252/IND/2007
Subject(s)
PLANNING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
Appendix: p. 59 - 70
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00949/08
(T) - 658.5038 Soe D
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Manufacturing planning and control systems
Advances in service and industrial robotics
Perancangan sistem keandalan dengan Rantai Markov Kontinu
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Perencanaan kebutuhan bahan baku dan pemilihan supplier di PT. Indonesia multi Colour Printing
Transfer teknologi di PT Indospring, Tbk
Menentukan sistem perawatan mesin dengan mempertimbangkan faktor biaya di PT. X
Lean for dummies