Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Author
Soebastian, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas akhir No.03011252/IND/2007
Subject(s)
PLANNING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
Appendix: p. 59 - 70
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00949/08
(T) - 658.5038 Soe D
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Market-focused production system
LKP : PT Sumber Djaja Perkasa Surabaya
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Gender research on urbanization, planning, housing and everyday life
Peningkatan efisiensi man power melalui pencapaian line balancing dan perbaikan process flow pada spin on filter assembly line 2 di PT X
Business process improvement workbook