Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Jenis pekerjaan yang mendominasi komposisi biaya pembangunan rumah tinggal
Author
Jap, Yung Tce
Additional Author(s)
Tjowasi, Rio Tjiputra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011619/SIP/2008
Subject(s)
BUILDING-ESTIMATES
Notes
Appendix: p. 204 - 233
Bibliography: p. 203
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 233 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04600/08
(T) - 692.5 Jap J
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis bangunan menghitung anggaran biaya bangunan
Uji aplikasi program sistem informasi estimasi biaya (SIEB) pada proyek rumah tinggal sederhana
Estimating in building construction
How to estimates building losses and construction costs
Practice and procedure for the quantity surveyor
Estimating in building construction
Construction estimating techniques
Analisa (cara modern) anggaran biaya pelaksanaan