Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
Author
Dewabrata, Christopher O.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011608/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 57 - 71
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04673/08
(T) - 658.404 Dew S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Perbandingan produktivitas pekerjaan pasangan dinding bata ringan dan bata merah pada proyek perumahan di Surabaya
Penjadwalan proyek pembuatan tabung pemindah panas di CV Alpha Omega Pandaan
Perbandingan sisa material antara dinding bata konvensional dengan dinding bata ringan pada proyek perumahan
Analisis perlakuan akuntansi pada perusahaan jasa konstruksi