Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan beberapa initial state yang digunakan pada simulated annealing
Author
Pranoto, Mila
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011318/IND/2008
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
Appendix: p. 77 - 196
Bibliography: p. 76
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 196 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04750/08
(T) - 658.53 Pre P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Techniques for construction network scheduling
Analisis dan perancangan perbaikan sistem produksi dan inventori barang jadi di UD Mitra Usaha
Perbaikan inventory dan penjadwalan produksi untuk memenuhi demand di CV. Sukses Bersama Sejahtera
Scheduling
Sistem persediaan suku cadang forklift di PT. Boma Bisma Indra Pasuruan
Perencanaan dan pengendalian produksi di Agrindo engineering unit PT. Agrindo
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri