Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Author
Wijaya, Ferdianto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01041304/IND/2008
Subject(s)
LABOR PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 53 - 94
Bibliography: p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 94 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04782/08
(T) - 658.5 Wij K
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi pada UD. X
Optimalisasi tenaga kerja pada lini produksi thimonier dan emec-tak 6 di PT Smart Tbk.
Perencanaan dan pengendalian biaya produksi secara kuantitatif dalam usaha meningkatkan efisiensi biaya produksi PT ABC
Studi tentang vehicle routing problem with time windows (vrptw) dengan menggunakan metode simulated annealing
Analisis fungsi manajemen operasional pada PT. Puyuh Plastic
Misselection analyzing and productivity improvement at biscuit selection department in PT Doulton
Pengaruh evaluasi prestasi dan kompensasi dalam meningkatkan produktivitas kerja karyawan di PT pangestu Segoro Indonesia Surabaya
Perencanaan luas produksi optimal dengan metode goal programming pada PT. Susanti Megah di Surabaya