Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Author
Wijaya, Ferdianto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01041304/IND/2008
Subject(s)
LABOR PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 53 - 94
Bibliography: p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 94 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04782/08
(T) - 658.5 Wij K
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis persediaan spare parts di PT H.M. Sampoerna Plant Sukorejo-Pandaan
Lean maintenance
Leading manufacturing excellence
Pengurangan jumlah produk setengah jadi di PT. SEMB-PEL
Quality improvement at holloware casting departement in PT Doulton
Analisa mengenai faktor-faktor yang mempengaruhi kinerja tenaga kerja pada PT. X
Kaizen for the shopfloor
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik