Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Author
Wijaya, Ferdianto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01041304/IND/2008
Subject(s)
LABOR PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 53 - 94
Bibliography: p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 94 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04782/08
(T) - 658.5 Wij K
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Product juggernauts
Peranan disiplin kerja motivasi kerja dan produktivitas kerja karyawan PT Kiki Wijaya Plastik di Gedangan-Sidoarjo
Production and operations management
Dampak kebijakan upah dan disiplin kerja terhadap prestasi kerja karyawan PT Mentari Massen Toys
Perbaikan mutu proses pengisian air ke dalam botol di PT Tirtamas Megah
Penentuan luas produksi untuk mencapai kontribusi margin maksimum dalam produksi pada Perusahaan Kembang Gula Blimbing di Surakarta
Make or buy analysis dalam memenuhi permintaan produk dari mesin injection di PT Asia Pramulia
Analisis dan perancangan perbaikan sistem produksi dan inventori barang jadi di UD Mitra Usaha