Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Author
Wijaya, Ferdianto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01041304/IND/2008
Subject(s)
LABOR PRODUCTIVITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 53 - 94
Bibliography: p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 94 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04782/08
(T) - 658.5 Wij K
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Rekayasa mutu pada proses pembuatan arang dengan menggunakan metode taguchi
Analisis pengaruh penilaian prestasi kerja dan kompensasi terhadap produktivitas kerja karyawan PT Heptasari Unggul Surabaya
Evaluasi spesifikasi produk relay untuk menurunkan reject operating voltage di PT. Schneider Electric Manufacturing Batam
Period batch control
Penerapan activity based costing dan activity based management untuk menentukan harga pokok produksi di pt. serasa purna cipta
LKP: New Grand Park Hotel Surabaya
Peranan anggota keluarga dalam pengelolaan bisnis keluarga (studi deskriptif pada proses manajemen produksi dan operasional)
Perbaikan ergonomi untuk pekerjaan manual pada welding line di PT. Toyota Motor Manufacturing Indonesia