Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
Author
Limantoro, Roy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01011309/IND/2008
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION PLANNING
INDUSTRIAL EFFICIENCY
INDUSTRIAL MANAGEMENT
Notes
Appendix: p. 67 - 112
Bibliography: p. 66
Abstract
-
Physical Dimension
Number of Page(s)
xii, 112 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04875/08
(T) - 658.515 Lim E
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Plant layout and flow improvement
Analisa pengendalian bahan baku pada depot mie dan lemper 168 di Surabaya
LKP : di PT Ometraco Arya Samanta Surabaya
LKP : PT Kedawung Setia Industrial Surabaya
LKP : CV Dwitama Informatika
Perbaikan peramalan pemakaian bahan baku di PT. X dengan mempertimbangkan faktor special event
Perencanaan dan pengendalian produksi di pt. Interkraft