Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa balance of plant pembangkit listrik tenaga uap (PLTU) dengan daya 25 mw dan tegangan 6,3 kv pada PT. Prima Elektrik Power
Author
Budiman, Arief
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010591/ELK/2008
Subject(s)
STEAM POWER PLANTS
STEAM-TURBINES
Notes
Appendix
Bibliography: 73 - 74
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 74 p.
Dimension
30 cm.
Other Desc.
il.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00224/09
(T) - 621.4 Bud A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Teori pembangunan dunia ketiga
Pengalaman belajar di Amerika Serikat
Pembagian kerja secara seksual
Sistem perekonomian Pancasila dan ideologi ilmu sosial di Indonesia
Studi teknis pengoperasian PLTU 3,9 MW dengan bahan bakar batu bara, serpihan kayu dan potongan veneer di PT. Hendratna Plywood Banjarmasin
Perencanaan turbin uap pembangkit listrik kapasitas 6 Mw
Turbin uap
Steam turbines