Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Author
Suwanto, Bryan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas akhir No.21011681/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix : p. 90 - 148
Bibliography : p. 88 - 148
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 148 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03348/09
(T) 658.404 Suw F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Inspeksi fabrikasi dan ereksi pada konstruksi baja proyek gedung P1-P2 UK Petra Surabaya
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Studi literatur tentang penerapan metode T.R.I.Z. di bidang teknik sipil
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Construction scheduling and control
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi