Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem aliran informasi dan barang untuk mengurangi lead time di PT X
Author
Tandiono, Yauwseph
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041367/IND/2009
Subject(s)
PRODUCTION PLANNING
TIME STUDY
Notes
Appendix : p. 117 - 149
Bibliography : p. 116
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03792/09
(T) 658.54 Tan P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan produktivitas line spion on assy dengan metode lean manufacturing di PT. FSCM Manufacturing
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Perancangan manufacturing resource planning (mrp ii) di pt filma utama soap
Perancangan sistem Pengendalian Persediaan Bahan Baku di PT. Multiplast Jaya Tatamandiri
Analisa keseimbangan lintasan dengan mempertimbangkan studi gerakan pada lini perakitan 2 CV. Sinar Baja Electric
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
LKP : PT Djajanti Universal Gresik
Analisa peningkatan fasilitas untuk meningkatkan produktivitas di departemen spinning di PT Lotus Indah Textile