Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem aliran informasi dan barang untuk mengurangi lead time di PT X
Author
Tandiono, Yauwseph
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041367/IND/2009
Subject(s)
PRODUCTION PLANNING
TIME STUDY
Notes
Appendix : p. 117 - 149
Bibliography : p. 116
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03792/09
(T) 658.54 Tan P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengidentifikasian waste melalui value stream mapping dan upaya pengurangan waste pada Departemen PK PT X
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Perencanaan produksi dan persediaan di PT. Tirta Bahagia
Perencanaan dan penjadualan produksi di PT.Duta Citra Audio Raya
Pengendalian persediaan bahan baku dengan demand probabilistik di PT X
Perancangan prosedur operasional sebagai pedoman baku pemenuhan order di PT Supra Aspindo Jaya
Peningkatan produktivitas dengan minimalisasi aktivitas non-productif pada industri corrugated carton box PT. Lestari Karya Makmur
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan