Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
Author
Wibisono, Stephanus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041355/IND/2009
Subject(s)
PRODUCTION MANAGEMENT
MANUFACTURING PROCESSES
PRODUCTION ENGINEERING
Notes
Appendix : p. 36 - 84
Bibliography : p. 35
Abstract
-
Physical Dimension
Number of Page(s)
xi, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03726/09
(T) 658.5 Wib P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis dan usulan perbaikan terhadap produk jadi yang berstatus hold dengan metode DMAIC pada PT. X
Perancangan sistem management mutu ISO 9001:2000 di PT. X
Modifikasi mesin manual vacuum forming dengan pendekatan ergonomis
Pengukuran, pengevaluasian, dan perencanaan perbaikan produktivitas di PT. Multiplast Jaya Tatamandiri
Penentuan kombinasi jumlah produksi yang optimal dengan menggunakan metode simplex pada PT King Halim Jewerly Surabaya
Analisis produktivitas dengan metode omax di P.T. Surabaya Perdana Rotopack
LKP : di PT Ometraco Arya Samanta Surabaya
Peningkatan produktivitas line spion on assy dengan metode lean manufacturing di PT. FSCM Manufacturing