Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengoptimalan sistem kanban internal lantai 3 di PT. Schneider Electric Manufacturing Batam
Author
Santoso, Eric Yonaga
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021420/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix : p. 49 - 298
Bibliography : p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 298 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01781/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan luas produksi optimal dengan metode goal programming pada PT. Susanti Megah di Surabaya
Analisa yield material dan standard kerja TSKK (Tabel Standard Kerja Kombinasi) area press stamping di seksi part manufacturing departemen produksi PT. XYZ Pulogadung
Integrative manufacturing
Upaya peningkatan output produksi pada faisilitas kerja departemen preparation di PT. Integra Indocabinet
Manajemen gaya microsoft
Lean performance ERP project management
How to implement lean manufacturing
Penentuan luas produksi untuk mencapai kontribusi margin maksimum dalam produksi pada Perusahaan Kembang Gula Blimbing di Surakarta