Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Strategy in working capital management under adverse economic condition: a case study of Indonesia construction smes : thesis
Author
Sanjaya, Andi
Additional Author(s)
-
Publisher
Bangkok, Thailand: Asian Institute of Technology, 2009
Language
English
ISBN
-
Series
Thesis No. CM-09-27
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-CAPITAL INVESTMENT
CONSTRUCTION INDUSTRY-CASE STUDIES
Notes
Appendix: p. 68 - 70
Bibliography: p. 65 - 66
Abstract
-
Physical Dimension
Number of Page(s)
vii, 70 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02276/10
(T2) - 690.068 San S
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisis waktu pekerjaan finishing pada proyek apartemen
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Pengaruh dilatasi pada bangunan dengan ketidakberaturan sudut dalam yang didesain secara direct displacement based
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Prediksi kinerja waktu proyek konstruksi
Evaluasi unsafe act dan unsafe condition pada suatu proyek