Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Strategy in working capital management under adverse economic condition: a case study of Indonesia construction smes : thesis
Author
Sanjaya, Andi
Additional Author(s)
-
Publisher
Bangkok, Thailand: Asian Institute of Technology, 2009
Language
English
ISBN
-
Series
Thesis No. CM-09-27
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-CAPITAL INVESTMENT
CONSTRUCTION INDUSTRY-CASE STUDIES
Notes
Appendix: p. 68 - 70
Bibliography: p. 65 - 66
Abstract
-
Physical Dimension
Number of Page(s)
vii, 70 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02276/10
(T2) - 690.068 San S
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi tentang implementasi dan pendapat kontraktor terhadap program keselamatan kerja pada proyek mall di Surabaya
Decision and risk analysis for construction management
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Analisis unsafe act dan unsafe condition pada proyek pembangunan gedung x
Construction management
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek