Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Strategy in working capital management under adverse economic condition: a case study of Indonesia construction smes : thesis
Author
Sanjaya, Andi
Additional Author(s)
-
Publisher
Bangkok, Thailand: Asian Institute of Technology, 2009
Language
English
ISBN
-
Series
Thesis No. CM-09-27
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-CAPITAL INVESTMENT
CONSTRUCTION INDUSTRY-CASE STUDIES
Notes
Appendix: p. 68 - 70
Bibliography: p. 65 - 66
Abstract
-
Physical Dimension
Number of Page(s)
vii, 70 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02276/10
(T2) - 690.068 San S
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Studi literatur tentang constructability dalam proyek konstruksi
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Pengukuran tingkat motivasi dan demotivasi pekerja konstruksi pada suatu proyek di Surabaya
Analisis kepuasan penghuni perumahan Pondok Tjandra Indah
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya