Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan kontraktor di Surabaya
Author
Sinaga, Lowig Caesar
Additional Author(s)
Wattimena, Oswyn Karsten
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011728/SIP/2010
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix : p. 57 - 77
Bibliography : p. 55 - 56
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 77 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03280/10
(T) 658.314 Sin M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Perkembangan real estat citraraya di surabaya
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Project management in construction
Studi kasus perbandingan berbagai bata ringan dari segi material biaya, dan produktivitas
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Pengaruh kualitas layanan purna jual terhadap kepuasan dan loyalitas konsumen rumah menengah atas di Surabaya