Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas pemancangan tiang pancang dengan jack-in pile pada proyek showroom
Author
Wenas, Augustine
Additional Author(s)
Gendo, Ricky
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011722/SIP/2010
Subject(s)
PILING (CIVIL ENGINEERING)
Notes
Appendixk : p. 99 - 121
Bibliography : p. 97
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03255/10
(T) 624.154 Wen P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perhitungan pondasi pile-raft dengan menggunakan program plaxis
Faktor-faktor yang mempengaruhi produktifitas pemancangan tiang tekan
Penelitian suatu jenis tiang pancang yang di cor ditempat dengan suatu model
Produktivitas pemancangan tiang tekan pada bangunan apartemen
Uses of mini piles and micro piles in foundation works
Evaluasi faktor-faktor yang mempengaruhi pemancangan jack-in pile
Reinforced concrete foundations
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya