Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan keputusan pemeliharaan mesin gulung di PT E-T-A dengan Reliability Centered Maintenance (RCM)
Author
Raharjo, Aileen Valencia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 02021478/IND/2010
Subject(s)
MACHINERY-MAINTENANCE AND REPAIR
MAINTENABILITY (ENGINEERING)-RESEARCH
RELIABILITY (ENGINEERING)-RESEARCH
Notes
Appendix : p. 50 - 52
Bibliography : p. 49
Abstract
-
Physical Dimension
Number of Page(s)
x, 52 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03813/10
(T) 658.202 Rah P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan jadwal preventive maintenance di PT. Puterasean
Perancangan strategi perawatan yang tepat dengan reliability centered maintanance di PT. X
Industrial machinery repair
Perencanaan penjadwalan perawatan mesin produksi di PT. "X"
Upaya peningkatan overall equipment effectiveness (OEE) di PT 'X'
Pengukuran overall equipment effectiveness (OEE) di PT Astra Otoparts Tbnk. divisi Adiwira Plastik
Minimalisasi kegagalan sirkulasi pengembalian feed pada mesin pellet di PT. Charoen Pokphand Indonesia Feedmill
Sistem pengendalian persediaan suku cadang di PT. Romos Inti Cosmetic