Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Author
Wiryono, Nicho Francisco
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021434/IND/2010
Subject(s)
PRODUCTION PLANNING
TIME STUDY
JUST-IN-TIME SYSTEMS
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 61
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 61 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03845/10
(T) 658.562 Wir P
-
Unavailable : Removed
Similar Collection
by author or subject
Operations management
Modern production/operations management
Pengaruh komitmen top manajemen terhadap kinerja proyek melalui kemampuan tim proyek dan desain proyek
Penurunan tingkat kecacatan di PT. Mitra Anugrah
Operations management
Perancangan pagar lipat dengan menggunakan 3D parametric modularity design dan pembuatan virtual realitynya
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Finding profit