Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Author
Marsisca, Angela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021433/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 59 - 89
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00546/11
(T) 658.5 Mar P
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan linear programming untuk memaksimumkan laba dalam produk mix pada PT. "X" di Gresik
Pengukuran kinerja pt cahaya angkasa abadi dengan metode balanced scorecard
Optimalisasi kapasitas proses finishing pallet ditinjau dari pencapaian kualitas di PT Domusindo
Dampak metode penentuan kuantitas pembelian terhadap bullwhip effect dalam rantai pasok
Penjadwalan produksi dan pengendalian persediaan dengan tujuan optimalisasi biaya produksi pada divisi paku PT Surabaya Wire (suatu pendekatan program dinamis)
Penerapan tools integrasi perencanaan produksi pada departemen production planning and inventory control PT. FSCM Manufacturing Indonesia
LKP: analisa 4P (product, price, place, promotion) hotel Satelit Surabaya, jln. Mayjen Sungkono 139 Surabaya
Lean manufacturing