Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Author
Marsisca, Angela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021433/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 59 - 89
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00546/11
(T) 658.5 Mar P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : pengendalian persediaan bahan baku amoniak dan analisa manajemen sumber daya manusia di PT Utama Malang
Pengendalian intern dalam pembelian bahan baku PT "X" di Driyorejo, Bambe
Penerapan anggaran fleksibel sebagai alat perencanaan dan pengendalian biaya produksi pada pt. Serba Guna Pare-Kediri
LKP : UD Karya Agung
Pengurangan jumlah produk setengah jadi di PT. SEMB-PEL
Perancangan pengembangan produk baru pada CV Sekawan Sidoarjo
Product design and development
Operation management for competitive advantage