Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Author
Marsisca, Angela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021433/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 59 - 89
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00546/11
(T) 658.5 Mar P
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Operation management
Peningkatan output produksi di PT. XYZ
Analisis waste di PT X pada departemen SCM
Pengendalian persediaan dengan menggunakan sistem material requirements planning untuk meminimalkan persediaan bahan baku pada PT. Tunggal djaja indah
Analisa penurunan reject rate produk plastic tube di p.t. x
Perencanaan kebutuhan kapasitas produksi di PT Bahari Mitra Surya
LKP : UD Cipta Jaya