Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Author
Marsisca, Angela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021433/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 59 - 89
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00546/11
(T) 658.5 Mar P
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
Analisis waste di PT X pada departemen SCM
Production systems
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Kaizen for the shopfloor
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Perancangan form audit dan instruksi penerapan 5S di divisi research and development CV Sinar Baja Electric
Product design and development