Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Author
Marsisca, Angela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021433/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 59 - 89
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00546/11
(T) 658.5 Mar P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Pengendalian kualitas pada proses produksi air minum di PT Tirta Jayamas Unggul di Pandaan
Penerapan sistem material requirements planning (MRP) sebagai alat untuk meningkatkan efisiensi biaya persediaan bahan baku pada PT. Siantarjaya Ekatama Surabaya
Operations management
Manajemen produksi
Perancangan job description, sistem pencatatan, dan penyempurnaan sistem 5S di bagian gudang benang PT. XXX
Modern production / operations management