Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Author
Chandra, Tommy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021462/IND/2010
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 54 - 99
Bibliography : p. 53
Abstract
-
Physical Dimension
Number of Page(s)
xii, 99 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00547/11
(T) 658.5 Cha P
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan ketepatan pendataan line stop guna menurunkan loss time pada proses assembly drive chain dan cam chain di PT. XYZ
Penyusunan Hazard Analysis Critical Control Point (HACCP) produk sosis di PT Aromaduta Rasaprima
Implementasi theory of constraints (TOC) guna mengoptimalkan profit di PT Teja Sekawan Cocoa Industri Surabaya
Business process improvement workbook
LKP : PT Hasuno Putra Utama Surabaya
Pengaruh komitmen manajemen dan inovasi perusahaan pada kinerja operasional usaha kecil menengah
Operations management
LKP : PT Boma Bisma Indra divisi diesel II Surabaya