Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Author
Febianto C., Agus Ming
Additional Author(s)
Tanny, Jerry W.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No.21011759/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Bibliography : p. 102
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 102 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01899/11
(T) 658.314 Feb P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis hubungan antara tingkat tindakan tidak aman dan keefektifan pekerja pada proyek
Studi kasus tentang aspek-aspek pemancangan pada proyek metropolis apartment-Surabaya
Marine works with cost estimation for ashkelon desalination project
Kepuasan mandor terhadap pola komunikasi pada proyek perumahan
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Survei tingkat kepuasan penyewa terhadap fasilitas yang disediakan pengelola di gedung perkantoran "X" Surabaya
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Evaluasi unsafe act dan unsafe condition pada suatu proyek