Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Author
Febianto C., Agus Ming
Additional Author(s)
Tanny, Jerry W.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No.21011759/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Bibliography : p. 102
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 102 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01899/11
(T) 658.314 Feb P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan sistem tunggal dan sistem ganda pada bangunan terbreis eksentris berbentuk V terbalik dan diagonal pada mid rise building
Studi banding macam-macam denda keterlambatan penyelesaian proyek konstruksi
Analisis biaya dan kemungkinan investasi rumah tipe di Citra Raya dan Wisata Bukit Mas
Construction contracting
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Pengaruh ketidakberaturan massa vertikal pada bangunan yang direncanakan secara direct displacement based design
Faktor-faktor yang mempengaruhi perancangan produk komponen modular untuk rumah tinggal di Surabaya
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding