Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Author
Febianto C., Agus Ming
Additional Author(s)
Tanny, Jerry W.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No.21011759/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Bibliography : p. 102
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 102 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01899/11
(T) 658.314 Feb P
-
Unavailable : Removed
Similar Collection
by author or subject
Karakteristik pembangunan rumah burung walet dilihat dari aspek manajemen konstruksi
Karier wanita dan faktor-faktor yang berpengaruh dalam proyek konstruksi
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Kecelakaan kerja pada pekerjaan beton bertulang akibat faktor manusia
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Evaluasi sistem estimasi biaya proyek pada perusahaan kontraktor di surabaya