Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis rangkaian produktivitas breaker-pekerja-dump truck pada sebuah pengelolaan tambang lime stone
Author
Wiyanto, Bambang
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2011
Language
Indonesian
ISBN
-
Series
Tesis No. 01000155/MTS/2011
Subject(s)
LABOR PRODUCTIVITY
Notes
Appendix : p. 43 - 51
Bibliography : p. 42
Abstract
-
Physical Dimension
Number of Page(s)
xi, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02447/11
(T2) 658.3045 Wiy A
-
Unavailable : Removed
Similar Collection
by author or subject
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Pengaruh motivasi dan pelatihan dalam meningkatkan produktivitas kerja karyawan perusahaan batik Mahkota Agung di Pekalongan
The loyalty effect
Pentingnya motivasi dan disiplin kerja karyawan terhadap peningkatan produktivitas di PT Antar Surya Jaya Surabaya
Analisa line balancing pada proses produksi cat tembok paragon di PT Tunggal Djaya Indah
Peran pemimpin dalam meningkatkan produktivitas karyawan PT. Adaya Multi Indoteknik
Penentuan tingkat kebutuhan operator di PT. Centralwindu Sejati
Analisa peranan inovasi proses terhadap produktivitas operasional (studi kasus pada Ilo Bakery Surabaya)