Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Author
Limandinatha, Yesica
Additional Author(s)
Limantoro, Jeffry
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011802/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION MANAGEMENT
Notes
Bibliography : p. 179 - 180
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 180 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03928/11
(T) 658.924 Lim I
-
Unavailable : Removed
Similar Collection
by author or subject
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Evaluasi faktor penyebab, kuantitas, akibat dan tindakan dari sisa material pada proyek rumah tinggal
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Usulan implementasi sistem umpan balik360 derajat di perusahaaan konstruksi X
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi