Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Author
Limandinatha, Yesica
Additional Author(s)
Limantoro, Jeffry
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011802/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION MANAGEMENT
Notes
Bibliography : p. 179 - 180
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 180 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03928/11
(T) 658.924 Lim I
-
Unavailable : Removed
Similar Collection
by author or subject
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik
Building economics
Project management
Construction contracting