Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Author
Sanusi, Vincent
Additional Author(s)
Valentino, Dennys
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011790/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix : p. 45 - 59
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00166/12
(T) 690.068 San S
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Studi kasus tentang aspek-aspek pemancangan pada proyek metropolis apartment-Surabaya
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan
Penerapan value engineering pada proyek konstruksi
LKP : proses produksi di PT Supra Aspindo Jaya
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Studi mengenai faktor-faktor penyebab rework pada proyek-proyek di Surabaya