Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Author
Sanusi, Vincent
Additional Author(s)
Valentino, Dennys
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011790/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix : p. 45 - 59
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00166/12
(T) 690.068 San S
-
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang generic strategy terhadap kontraktor pemula
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali
Sistem penjadwalan LSM untuk proyek instalasi pipa bawah tanah (studi kasus: fuel supply system, proyek pengembangan Bandara Juanda Surabaya)
Perbandingan sisa material antara dinding bata konvensional dengan dinding bata ringan pada proyek perumahan
Studi joint risk management pada proyek konstruksi di Surabaya
Karakteristik pembangunan rumah burung walet dilihat dari aspek manajemen konstruksi
LKP : PT Glogarindo Surabaya
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan