Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Author
Sanusi, Vincent
Additional Author(s)
Valentino, Dennys
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011790/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix : p. 45 - 59
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00166/12
(T) 690.068 San S
-
Unavailable : Removed
Similar Collection
by author or subject
Karakteristik pembangunan rumah burung walet dilihat dari aspek manajemen konstruksi
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Penelitian awal penanganan kontraktor terhadap direct waste material pada proyek konstruksi di Surabaya
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
The structuring of build-operate-transfer construction projects
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Aplikasi program primavera project planner pada perencanaan dan penjadwalan proyek rusun
Construction equipment policy