Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan metode line of balance pada pekerjaan struktur yang tipikal pada suatu proyek apartemen
Author
Pratomo, Yulianto
Additional Author(s)
Honoris, Zico Sinaga
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011829/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY
SCHEDULING
STRUCTURAL ENGINEERING
Notes
Appendix : p. 52 - 102
Bibliography : p. 51
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 102 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01857/12
(T) 658.924 Pra S
-
Unavailable : Removed
Similar Collection
by author or subject
Studi contributory work and non-contributory work pada proses pekerjaan struktur salah satu perumahan di Surabaya Timur
Uncertainty analysis, laods, and safety in structural engoneering
Masted structures in architecture
Ruaumoko manual
Efek material pengisi kalsium karbonat dan waste marble dust terhadap sifat mekanik mortar
Pengukuran kualitas pekerjaan finishing pada suatu proyek konstruksi di Surabaya
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya
Analisa faktor-faktor penyebab rework dan tingkat kesulitan pencegahannya pada pekerjaan struktur, finishing, dan mep