Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus pengukuran pengaruh faktor-faktor terhadap produktivitas pekerja pada proyek konstruksi
Author
Kristianto, Nickodemos
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Pascasarjana Magister Teknik Sipil UK Petra , 2012
Language
Indonesian
ISBN
-
Series
Tesis No. 01000170/MTS/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY
Notes
Appendix : p. 66 - 83
Bibliography : p. 65
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 83 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03082/12
(T2) 690.068 Kri S
-
Unavailable : Removed
Similar Collection
by author or subject
Metode praktis inspeksi pemasangan scaffolding pada suatu proyek konstruksi
CPM in construction management
Pengaruh dilatasi pada bangunan dengan ketidakberaturan sudut dalam yang didesain secara direct displacement based
Buildings and health
Pengaruh kepercayaan terhadap kepuasan dan kesuksesan proyek konstruksi
Principles of construction management for engineers and managers
Permodelan geser dinding geser beton untuk analisis non-linier
Peningkatan produktivitas tenaga kerja area produksi assy air cleaner di PT. Astra Otoparts divisi adiwira plastik