Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan analisa EVA pada perusahaan konstruksi
Author
Subianto, Kwari Sastro
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Pascasarjana Magister Teknik Sipil UK Petra , 2012
Language
Indonesian
ISBN
-
Series
Tesis No. 01000167/MTS/2012
Subject(s)
BRIDGE CONSTRUCTION INDUSTRY
PROJECT MANAGEMENT
Notes
Appendix : p. 68
Bibliography : p. 67
Abstract
-
Physical Dimension
Number of Page(s)
xii, 104 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03085/12
(T2) 658.924 Sub P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Executing your strategy
Analisis hubungan kemitraan dalam mencapai kesuksesan proyek dengan metode sem
Permodelan penjadwalan linier dengan alokasi sumber daya manusia pada proyek perumahan
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Identifikasi nvaau dan studi vsm pada proyek X di Surabaya
Penerapan dan pemberian milestone pada metode earned schedule untuk pengendalian penjadwalan pada beberapa proyek
Project planning, scheduling, and control