Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya meminimumkan waste work in process di line xub PT Schneider Electric Manufacturing Batam
Author
Hendrik, Christina
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021610/IND/2012
Subject(s)
WASTE PRODUCTS
WASTE MINIMIZATION
WASTE MANAGEMENT
FACTORY AND TRADE WASTE-MANAGEMENT
Notes
Appendix : p. 60-72
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 72 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04147/12
(T) 658.567 Hen U
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis alternatif pengolahan sampah untuk mengurangi tumpukan sampah di TPA Benowo dengan pendekatan sistem dinamik
Peningkatan yield departemen XYZ pada PT X
Value stream mapping sebagai upaya pengurangan waste di departemen S PT A
Pengurangan waste pada sistem EPAF harian/borongan di HR services PT. X
Pengidentifikasian waste dengan filosofi six sigma dan upaya pengurangan waste di PT Nojorono Tobacco International
Perancangan aksesoris interior menggunakan bahan limbah serbuk rotan
Analisis penerapan sistem manajemen limbah berdasarkan sertifikasi eco-hotel di Sheraton Surabaya Hotel and Towers