Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Author
Lande, Milka
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Pascasarjana Magister Teknik Sipil UK Petra , 2013
Language
Indonesian
ISBN
-
Series
Tesis No. 01000179/MTS/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 98 - 101
Bibliography : p. 96 - 97
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00656/13
(T2) 658.924 Lan S
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan kinerja sistem lif dengan sistem eskalator pada gedung P Universitas Kristen Petra Surabaya
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Manajemen proyek konstruksi
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Aplikasi program primavera project planner pada perencanaan dan penjadwalan proyek rusun
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi