Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : Perusahaan Umum Listrik Negara Proyek Induk Jaringan Jawa Timur dan Bali Surabaya
Author
Damianus
Additional Author(s)
-
Publisher
Surabaya: 1993
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik II
Subject(s)
ELECTRIC POWER PLANTS
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 49 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01493/94
L 621.3 Dam L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : instalasi listrik proyek Bank Pacific Surabaya
LKP : di PT Bhirawa Steel Surabaya
LKP : PT Surya Artha Graha Surabaya
LKP : CV Trisula Sentra Persada Surabaya
Mengurangi harmonisa arus pada sistem kelistrikan dengan menggunakan transformer penggeser fasa
Perencanaan dan pembuatan rele elektronik untuk mengamankan gangguan frekuensi lebih dan frekuensi kurang pada sistem 220 Volt (phasa netral)
LKP : elektris I P.T. Bismo Tunjungan Surabaya
Perencanaan dan pembuatan single bushing potential transformer 50 VA 20/V3KV/100/V3V class 1,0