Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa Bagian Timur dan Bali Sektor Surabaya Transmisi Surabaya Timur Gardu Induk Rungkut
Author
Alexander, Boyke
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Paktek Elektris II
Subject(s)
ELECTRIC POWER TRANSMISSION
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 70 p.
Dimension
29
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01210/95
L 621.3 Ale L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Keberadaan kerja praktek di jurusan teknik elektro Universitas Kristen Petra
LKP : PT Surabaya Agung Industri PULP dan Kertas Surabaya
Perencanaan dan pembuatan perangkat soft start dengan fasilitas speed control untuk motor DC 12 V menggunakan mikrokontroler MCS-51
LKP : PLN transmisi Surabaya Selatan gardu induk Waru
Studi tentang kedip tegangan di PT. Semen Kupang dengan daya 5 MVA dan tegangan 380 V
LKP : PT Albatec Inti Surabaya
Studi perencanaan setting ATS (Automatic Transfer Switch) penyulang 1 dan penyulang 2 terhadap optimalisasi pembebanan pelanggan potensial di PLN distribusi Jawa Timur
Analisis kualitas dan keandalan sistem tenaga listrik 150 KV di Jawa Timur Bagian Timur dan Bali setelah dioperasikannya PLTU Paiton dengan metode analisis aliran daya fast decoupled