Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Author
Wahyudi
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Tugas Akhir; No. 76 D
Subject(s)
BUILDING, WOODEN
CONCRETE CONSTRUCTION
STEEL, STRUCTURAL
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
... p.
Dimension
30
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02811/95
(T) 624 Wah T
-
Unavailable : Removed
2.
02812/95
(T) 624 Wah T
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : perencanaan dan pembuatan modul amplifier kelas B dan kelas AB untuk praktikum elektronika analog di Laboratorium Elektronika Universitas Kristen Petra Surabaya
Perencanaan dan pembuatan kontrol kecepatan motor DC dengan menggunakan kontrol PID dan autotuning berbasis PLC SYSMAC C-200H dengan bantuan ASCII unit dan program scada
Aplikasi fuzzy logic untuk pengaturan putaran motor universal 85 Watt, 200/220 Volt, 6.000 RPM
Perancanagan karya desain untuk pameran pendidikan Fakultas Ilmu Komunikasi
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Tugas konstruksi beton, tugas konstruksi baja, tugas konstruksi kayu
Beton-fertigteilbau