Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Maspion Group Surabaya
Author
Toni, Djaja
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC GENERATORS
ELECTRIC POWER SYSTEMS
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 65 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00304/96
L 621.3 Ton L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pembuatan kontrol otomatis untuk emergency dan stanby power systems dengan bantuan mikrokontroller 80C31 yang diaplikasikan pada generator ford-stanford 25 KVA
LKP : Bengkel Pertama Sidoardjo
LKP : PT Bismo Tunjungan Surabaya
Studi analisa pergeseran phasa pada transformator 3 , daya 3,3 KVA, tegangan 220/127 V, 50 Hz, dengan menggunakan pengaman differential relay MRD1-T, SEG
LKP : CV Trisula Sentra Persada
Mengurangi harmonisa arus pada sistem kelistrikan dengan menggunakan transformer penggeser fasa
LKP : PLTU sektor Gresik, Gresik
Studi penggunaan transformator zig-zag 127 v/220 va, 270 va hubungan A-Z dalam mengurangi efek harmonisa kelipatan 3 (triple-n) pada sistem distribusi tenaga listrik