Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : CV Albeltro Surabaya
Author
Santoso, Gunawan
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
ELECTRIC POWER DISTRIBUTION
ELECTRIC POWER DISTRIBUTION-EQUIPMENT AND SUPPLIES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
72 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01261/96
L 621.3 San L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pembuatan kontrol kecepatan motor DC seri dengan daya maksimum 1/4 PK, 24 VDC yang dapat diatur forward, break dan reverse dengan aplikasi ban berjalan
LKP : PT Bayu Beringin Lestari Surabaya
LKP : PT Hasuno Putra Utama Surabaya
Studi karakteristik volume tabung udara dan beban katup limbah terhadap efisiensi pompa hydraulic ram
Analisa perencanaan gardu induk dengan total daya 22.5 mva 20kv/400 v di PT. Pakuwon Permai Surabaya
Evaluasi kehandalan sistem transmisi 150 kV di Jawa Timur studi kasus: sistem transmisi 150 kv sektor Malang
Studi simulasi hybrid active filter seri-seri untuk meredam harmonisa pada induction furnace dengan menggunakan program PSIM
Studi pemakaian kapasitor 6.3 kv sebagai filter harmonik pada sistem distribusi listrik PT. Semen Gresik (persero) Tbk. Pabrik Tuban III