Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Bismo Tunjungan Surabaya
Author
Avianto, Herry
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
-
Subject(s)
ELECTRIC POWER SYSTEMS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 69 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01717/96
L 621.3 Avi L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pembuatan rectifier transformer 3 fasa multipulsa dengan daya 500 VA, 380/17 Volt
LKP : perusahaan dan industri mesin Aneka Mesin Malang
LKP : PT Albatec Inti Surabaya
Electric energy systems theory
Modern power system analysis
Pengaturan aliran daya aktif menggunakan transformator penggeser fasa dan penerapannya pd sistem tenaga listrik 150 KV di Jawa Timur
LKP : Jembatan Merah Plaza Surabaya
Power system stability