Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Bismo Tunjungan Surabaya
Author
Avianto, Herry
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
-
Subject(s)
ELECTRIC POWER SYSTEMS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 69 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01717/96
L 621.3 Avi L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : perusahaan dan industri mesin Aneka Mesin Malang
LKP : PT Albatec Inti Surabaya
Perencanaan dan pembuatan rectifier transformer 3 fasa multipulsa dengan daya 500 VA, 380/17 Volt
Power system harmonics
Active power filter menggunakan DSP card
Evaluasi pengaruh peralatan utama sistem distribusi tenaga listrik terhadap keandalan sistem dengan metode fmea (failure mode and effect analysis).studi kasus:sistem distribusi Jawa Timur penyulang...
Studi kualitas daya listrik di gardu N 1 divisi niaga PT PAL Indonesia
Simulasi dan analisa interaksi antara kapasitor dan harmonisa pada sistem kelistrikan di pt. semen gresik tuban III