Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Perkebunan XX (Persero) PG Kanigoro Madiun
Author
Galla, Wellem Fridz
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
ELECTRIC POWER SYSTEMS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 53 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01733/96
L 621.3 Gal L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa kerja on-load tap changer (OLTC) dalam operasinya menjaga agar tegangan sisi sekunder tetap andal dengan studi kasus pada gardu induk Rungkut dan gardu induk Banyuwangi
LKP : PT Barata Indonesia Surabaya unit machining
LKP : PT Pakuwon Jati Surabaya
IEEE recommended practice for the design of reliable industrial and commercial power systems
LKP : PT Bayu Beringin Lestari Surabaya
Analisis sistem tenaga listrik
Analisa perencanaan gardu induk dengan total daya 22.5 mva 20kv/400 v di PT. Pakuwon Permai Surabaya
Simulasi dan analisa potensi pembangkitan tenaga angin di Universitas Kristen Petra Surabaya menggunakan Wind Energy Assessment tool (WEA)