Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : gedung Kampus ITATS
Author
Berlyanto S., Nieno
Additional Author(s)
Putu S., Dewa
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek direksi; KP-27 D3K
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 42 p.
Dimension
32
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01779/96
L 624 Ber L/d
Library - 6th Floor
Available
Similar Collection
by author or subject
Manage your time!
Pengaruh kinerja tim pelaksana proyek pemerintah bagi pihak kontraktor terkait cash in-flow dalam proyek konstruksi
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Analisa faktor dan uji diskriminan terhadap kepuasan penghuni apartemen sekitar kampus di Surabaya
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
CPM in construction management
Studi literatur tentang prinsip-prinsip lean construction