Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Susanti Megah
Author
Fenny
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I: produksi
Subject(s)
QUALITY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION PROCESSES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 69 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03530/96
L 670.42 Fen L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan perluasan pabrik minuman teh botol "S" di PT X berdasarkan pertimbangan kapasitas produksi sekarang untuk mengantisipasi permintaan pasar
The Clash of values between April and Frank in their relationship in Richard Yates' revolutionary road
Upaya peningkatan pelayanan dan fasilitas transit bagi wisatawan asing selama di Surabaya
Penelitian proses implementasi ISO 9000 pada industri manufaktur di Jawa Timur
Quality control
Peningkatan daya tahan tahu putih di perusahaan tahu Budi Purnomo dengan metode factorial design
Penurunan tingkat kecacatan pada kemasan air minum di PT. X
LKP : PT Ace Metal Indonesia