Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Djajanti Universal Gresik
Author
Meilania, Selly
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen produksi
Subject(s)
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
-
Dimension
-
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03536/96
L 670.42 Mei L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Adi Nusantara Raya
Perancangan keseimbangan lintasan produksi dalam upaya meminimasi waktu menganggur di PT Djajanti Universal, Gresik
Perancangan keseimbangan lintasan produksi dalam upaya meminimasi waktu menganggur di PT Djajanti Universal, Gresik
Penentuan jumlah tenaga kerja yang optimal di perusahaan jangkar dengan metode linear programming
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Misselection analyzing and productivity improvement at biscuit selection department in PT Doulton
Peranan anggota keluarga dalam pengelolaan perusahaan keluarga (studi kasus produksi dan operasional pada perusahaan keluarga di Surabaya)