Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Tulus Tri Tunggal
Author
Lina
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II
Subject(s)
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 98 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03540/96
L 670.42 Lin L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Optimasi pelayanan kamar obat di Rumah Sakit Adi Husada
LKP : Sistem Informasi Manajemen Pro Divena Surabaya Jln. Jawa no. 30, Surabaya
Cute pet portrait
Perkembangan pengajaran bahasa Tionghoa di Surabaya
Operations management
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.
Analisis penyebab keterlambatan produksi departemen AD 2 PT. X
Penerapan weekly order change untuk mengurangi jangka waktu pemesanan komponen ekspor di PT Toyota Motor Manufacturing Indonesia