Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Kurniawan, Mimi
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
MANUFACTURING ENGINEERING
PLANT LAYOUT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 80 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03541/96
L 670.42 Kur L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Djajanti Universal Gresik
Perancangan dan pengembangan fasilitas kerja pada stasiun kerja filler dan boring PT Djajanti Universal, Gresik
Perancangan form audit dan instruksi penerapan 5S di divisi research and development CV Sinar Baja Electric
Operations management for competitive advantage
Penurunan tingkat kecacatan di CV Surya Mas
Lean manufacturing
Perancangan tata letak fasilitas melalui pendekatan simulasi di PT Sakata Angkasa
Perancangan sistem perencanaan dan pengendalian produksi di PT. Wim Cycle