Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Kurniawan, Mimi
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
MANUFACTURING ENGINEERING
PLANT LAYOUT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 80 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03541/96
L 670.42 Kur L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Djajanti Universal Gresik
Perancangan dan pengembangan fasilitas kerja pada stasiun kerja filler dan boring PT Djajanti Universal, Gresik
LKP : PT. Djajanti Universal Gresik
Operations management
Pengukuran, evaluasi, dan perencanaan terhadap peningkatan produktivitas pada perusahaan roti "limaran" Surabaya
Upaya penurunan jam kerja Reconstituted Tobacco Clove (RTC) line di primary processing department PT HM Sampoerna, Tbk
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Analisa yield material dan standard kerja TSKK (Tabel Standard Kerja Kombinasi) area press stamping di seksi part manufacturing departemen produksi PT. XYZ Pulogadung