Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Zindomas Surabaya
Author
Santoso, Budi
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION ENGINEERING-ANALYSIS DATA
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 33 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02300/97
L 670.42 San L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Faktor-faktor pemilihan pedel dan sirtu sebagai bahan perbaikan tanah
LKP: di PT Sanjaya Surabaya
Perencanaan dan pembuatan daya nyata (KWH meter), untuk tegangan 220/380 volt, arus 6 ampere, 3 phasa untuk industri dengan menggunakan MCS-51
LKP : bagian proyek pembangunan Jalan Gempol-Pasuruan (paket AK-3) Bangil
LKP : PT Boma-Bisma-Indra (Persero) divisi mesin peralatan pabrik Pasuruan
Pengoptimalan komposisi produksi dengan memaksimumkan laba di PT. Imanuel Jaya
Perbaikan kinerja proses produksi cetakan tiang pancang di CV Delta Mas
LKP : di CV Lambang Jaya ; mesin pengering kapulaga