Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP: penyusunan material requirement planning di PT Aditya Angkasa Rungkut
Author
Nyoo, Hwie Djieng
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
BULB INDUSTRY
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 70 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02376/97
L 670.42 Nyo L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor-faktor yang mendahului kesuksesan produk baru
Operations management
Just-in-time dalam sistem produksi toyota
Peningkatan ketepatan pendataan line stop guna menurunkan loss time pada proses assembly drive chain dan cam chain di PT. XYZ
Perbaikan ergonomi untuk pekerjaan manual pada welding line di PT. Toyota Motor Manufacturing Indonesia
LKP : PT Buduran Jayatama
Leading manufacturing excellence
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia