Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Pancasurya Jayapratama
Author
Sumarli, Sabrina
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
SHOE INDUSTRY
TIME MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 57 p.
Dimension
30 cm
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02380/97
L 670.42 Sum L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem pengendalian persediaan bahan baku karet sintetis di PT Surya Mas Agung
LKP : Bengkel Bersaudara Surabaya
LKP : pabrik mesin rotar Surabaya
Peningkatan kapasitas produksi pada PT. Adicitra Bhirawa
LKP : CV Laksana Semarang
Perencanaan produksi dan kebutuhan bahan baku di cv 'X'
LKP : mekanis PT. Meco Inoxprima pembuatan H.W. Tank
LKP : PT Boma-Bisma-Indra (Persero) divisi mesin peralatan pabrik Pasuruan