Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Pancasurya Jayapratama
Author
Sumarli, Sabrina
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
SHOE INDUSTRY
TIME MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 57 p.
Dimension
30 cm
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02380/97
L 670.42 Sum L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem pengendalian persediaan bahan baku karet sintetis di PT Surya Mas Agung
LKP : di PT Mina Mas Utama Sidoarjo
LKP I : PT. Industri keramik Indonesia Mutiara
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Perencanaan kebutuhan bahan baku dan pengendalian produksi dalam usaha pemenuhan permintaan di PT. Mega Citra First
Teknologi mekanik
LKP : PT Bhirawa Steel Surabaya
LKP : PT Yanasurya Bhaktipersada Sidoarjo