Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa proses produksi dan perhitungan waktu standard pembuatan rokok kretek Dji Sam Soe di PT HM. Sampoerna : laporan kerja praktek
Author
Ferry
Additional Author(s)
HM. Sampoerna, PT. (Surabaya)
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
-
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 47 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02830/97
L 670.42 Fer A-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Manajemen risiko pada kecelakaan kerja di proyek konstruksi
LKP : PT New Minatex
Perencanaan instalasi pengolahan enceng gondok untuk menghasilkan bahan bakar biomassa
Optimasi jumlah operator radio panggil di PT W.W.