Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : pembangkit listrik gedung fakultas teknik Universitas Kristen Petra Surabaya
Author
Susanto, Andy Lesmana
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektrik II
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 35 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00018/98
L 621.3 Sus L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : pengamatan dan distribusi tenaga listrik di PT Bayu Beringin Lestari Surabaya
Studi karakteristik motor shaded pole
Studi tentang pengoperasian boiler turbine generator 1X5170 kw di PT. Sasa Inti Gending Probolinggo
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
Perencanaan dan pembuatan active load balancing unit pada generator 3 fase, 220/380 V, 25 KVA, beban dibatasi 5 KW, unit diparalel dengan PLN
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa bagian timur dan Bali sektor Brantas-PLTA Sengguruh
LKP : perencanaan dan pembuatan torsi meter untuk motor dengan daya 3 KW di Laboratorium Sistem Tenaga Listrik Universitas Kristen Petra