Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi listrik 1 MWATT di Hotel Novotel Surabaya
Author
Soegandi
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
35 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00051/98
L 621.3 Soe L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : pembuatan kapasitor bank 550 KVAR di PT Praya Karya Surabaya
Analisa pembangkit listrik tenaga surya untuk pengoperasian palang pintu kereta api di Jalan Kenjeran Surabaya
Studi Pemeliharaan pada jaringan bertegangan 20 KV dengan metode berjarak di PT. PLN PERSERO unit bisnis distribusi Jawa Timur UPJ Area Gresik
Studi kedip tegangan (voltage dip) di PT. Semen Gresik
Practical guide to power distribution for information technology equipment
Perkembangan distribusi tegangan menengah di surabaya selatan
Studi perencanaan instalasi dan distribusi Golden City Mall Surabaya
Studi perbandingan ketelitian hasil pengukuran metode voltmeter dan amperemeter pada pengukuran daya AC 1 fasa