Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : pekerjaan SUTT 150 KV Surabaya Selatan di PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Jawa Timur dan Nusa Tenggara
Author
Setiyono, Arif
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja prakek elektrik I
Subject(s)
ELECTRIC POWER TRANSMISSION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 73 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00105/98
L 621.3 Set L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Sistem distribusi dan instalasi listrik IRD di instalasi pemeliharaan sarana (IPS) RSUD DR. Soetomo Surabaya
Studi perencanaan saluran udara tegangan ekstra tinggi 500 KV Krian-Ungaran
Evaluasi kehandalan sistem transmisi 150 kV di Jawa Timur studi kasus: sistem transmisi 150 kv sektor Malang
Analisa voltage sag akibat single line to ground faults di PT. Semen Gresik Tuban II
Perhitungan keandalan transmisi sutet 500 KV Paiton Garti terhadap sambaran petir dengan metode dua titik
Transmission and distribution electrical engineering
Studi perencanaan saluran udara tegangan tinggi 150 KV Rungkut-Surabaya Selatan dengan Steel Pole
Studi kedip tegangan (voltage dip) di PT. Semen Gresik