Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : pekerjaan SUTT 150 KV Surabaya Selatan di PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Jawa Timur dan Nusa Tenggara
Author
Setiyono, Arif
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja prakek elektrik I
Subject(s)
ELECTRIC POWER TRANSMISSION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 73 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00105/98
L 621.3 Set L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Sistem distribusi dan instalasi listrik IRD di instalasi pemeliharaan sarana (IPS) RSUD DR. Soetomo Surabaya
Studi perencanaan saluran udara tegangan ekstra tinggi 500 KV Krian-Ungaran
Electrical power equipment safety series
Power system analysis
Operasi sistem tenaga listrik
Analisis pengaruh induksi sambaran petir tak langsung terhadap tegangan pada kawat saluran udara tegangan menengah 20 kV
Analisa reliability penyaluran daya listrik dari Jawa-Bali dengan mengubah konfigurasi busbar di gardu induk Banyuwangi dan gardu induk Gilimanuk menjadi terpisah
Studi Perencanaan Skutm 20 KV sebagai Express Feeder antara GI Segoromadu dengan GI Petrokimia dan GI Manyar UPJ Area Gresik