Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : pekerjaan SUTT 150 KV Surabaya Selatan di PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Jawa Timur dan Nusa Tenggara
Author
Setiyono, Arif
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja prakek elektrik I
Subject(s)
ELECTRIC POWER TRANSMISSION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 73 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00105/98
L 621.3 Set L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Sistem distribusi dan instalasi listrik IRD di instalasi pemeliharaan sarana (IPS) RSUD DR. Soetomo Surabaya
Studi perencanaan saluran udara tegangan ekstra tinggi 500 KV Krian-Ungaran
Studi perencanaan penyediaan catu daya 10,3 mv a bandara internasional juanda Surabaya dengan sistim 2 penyulang 20 kv pln apj Surabaya Selatan
Penentuan titik gangguan pada saluran transmisi menggunakan relay quadramho type SHPM 101 dengan implementasi pada SUTT 150 kV Situbondo-Banyuwangi
Study interkoneksi kelistrikan Jawa-Bali-Lombok dengan kabel laut tegangan tinggi 150 kV
Studi keandalan pada SUTM 20 kV dengan menggunakan tinggi tiang 9 meter dab 11 meter di penyulang mengare GI Manyar PLN UPJ Area Gresik
LKP : CV Libeltro Surabaya
Studi Pemeliharaan pada jaringan bertegangan 20 KV dengan metode berjarak di PT. PLN PERSERO unit bisnis distribusi Jawa Timur UPJ Area Gresik