Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : transformator dan sistem pengaman transformator daya 150/20 KV di PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Jatim dan Nusra
Author
Saksono, Ardyan Dwi
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Elektris I
Subject(s)
ELECTRIC POWER SYSTEMS
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 112 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00107/98
L 621.3 Sak L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : capasitor bank 1000 KVAR di Perum Perhutani Unit II Jawa Timur Industri Pengolahan Kayu Jati (IPKJ) Gresik
Studi tentang sistem operasional transformator daya 500/150 kV, 500 MVA di gardu induk Krian
Perencanaan dan pembuatan transformator injeksi arus bolak-balik dengan kapasitas 1200 A disimulasi dengan pengujian NFB 100 A
Analisa instalasi listrik plant 1 di PT Bumi Menara Internusa Surabaya
Evaluasi pengaruh peralatan utama sistem distribusi tenaga listrik terhadap keandalan sistem dengan metode fmea (failure mode and effect analysis).studi kasus:sistem distribusi Jawa Timur penyulang...
LKP : Bank Bumi Daya Tower Surabaya
Perencanaan instalasi listrik dan panel listrik menggunakan ecodial 3.3 pada pabrik coklat dengan daya 197 kva di Surabaya
Analisa gangguan satu fasa ke tanah yang mengakibatkan sympathetic trip pada penyulang yang tidak terganggu di PLN APJ Surabaya Selatan