Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi listrik di PT Surya Sakti Utama Surabaya
Author
Hitong, Albertus Fredrik
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 60 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00184/98
L 621.3 Hit L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
LKP : generator dan pembangkit listrik Shangri-La Hotel Surabaya
Underground power transmission
Identifikasi kontribusi sumber harmonisa pada sistem distribusi industri dengan menggunakan metode harmonic current vector
Evaluasi perancangan auxiliary equipments untuk pltu 25 mw di pt. adiprima suraprinta Gresik
Studi sistem kelistrikan pada tower telekomunikasi
Analisa gangguan satu fasa ke tanah yang mengakibatkan sympathetic trip pada penyulang yang tidak terganggu di PLN APJ Surabaya Selatan
Electrical power equipment safety series