Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi listrik di PT Surya Sakti Utama Surabaya
Author
Hitong, Albertus Fredrik
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 60 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00184/98
L 621.3 Hit L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
LKP : generator dan pembangkit listrik Shangri-La Hotel Surabaya
Studi analisa sistem distribusi dan instalasi listrik dengan menggunakan etap power station 4.0.0 pada hotel gajahmada graha
Identifikasi kontribusi sumber harmonisa pada sistem distribusi industri dengan menggunakan metode harmonic current vector
Analisis sistem tenaga listrik
Estimasi rugi-rugi energi pada sistem distribusi radial 20 kV dengan menggunakan pendekatan aliran daya pada program etap powerstation 4.0.0 studi kasus: sistem distribusi Jawa Timur penyulang ...
Analisa dan perencanaan perbaikan sistem distribusi tenaga listrik Kota Surabaya dengan pemasangan recloser, AVS dan FSI untuk meningkatkan keandalan penyaluran energi listrik ke konsumen yang disimul
LKP : sistem distribusi dan instalasi listrik Kondominium Beverly Park Surabaya di PT Murthy Kurnia Utama