Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi listrik di PT Surya Sakti Utama Surabaya
Author
Hitong, Albertus Fredrik
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 60 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00184/98
L 621.3 Hit L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : generator dan pembangkit listrik Shangri-La Hotel Surabaya
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
Studi penggunaan cubicle 20 KV double incoming dengan ATS untuk pelanggan diatas 1 MVA pada PLN distribusi Jawa Timur
Studi perencanaan setting ATS (Automatic Transfer Switch) penyulang 1 dan penyulang 2 terhadap optimalisasi pembebanan pelanggan potensial di PLN distribusi Jawa Timur
IEEE recommended practice for electric power distribution for industrial plants
Simulasi dan analisis pengaruh dristributed generation terhadap peningkatan arus hubung singkat pada sistem distribusi radial 20 kv studi kasus: penyulang Darmo Permai
Studi pengaruh penambahan pembumian yang diparalel kurang dari dua kali panjang efektif ditinjau dari dampak negatifnya terhadap trafo distribusi pln uj rungkut apj Surabaya Selatan
Studi perencanaan saluran udara tegangan tinggi 150 KV Rungkut-Surabaya Selatan dengan Steel Pole