Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi listrik di Plaza Tunjungan III (central plant) Surabaya
Author
Muljono, Eko
Additional Author(s)
-
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektrik II
Subject(s)
-
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 52 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00449/98
L 621.3 Mul L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Perencanaan dan pembuatan motor induksi linier double sided, 0,5 PK, 220V, 3 phasa, kecepatan 6 m/s diaplikasikan pada conveyer
LKP : pembangkit listrik PT Bayu Beringin Lestari Surabaya